At the end of 2022, Our team was tasked with installing the infrastructure of new electric vehicle (EV) charging points at Letchworth Station. This was part of a wider civils project across multiple stations to install EV points.
The works at Letchworth involved: digging out underground cable routes, installing an elevated cable trough system, installing various concrete bases for charger posts and equipment cabinets and restoring & resurfacing the area of car park once the cable infrastructure had been installed.